Mural Project at Russell Field
A middle-school student in North Cambridge proposed installing a mural in his neighborhood that “shows the community of Cambridge.” The mural will be installed on the Russell Field Fieldhouse.
2024 Post-Election Audit
Please be advised that in accordance with the provisions of Section 109A of Chapter 54 of the General Laws, the City of Cambridge was chosen for a post-election audit.
Sewer Cleaning and Lining
The City's contractor, National Water Main, is performing "cured-in-place" pipelining around the City. this process provides a new, jointless sewer pipe connection that minimizes root and water infiltration problems, improves flow and provides for a more structurally sound pipe without the need for excavation.