Hampshire at Prospect Intersection Safety

Hampshire St. at Prospect St. is a four-way, signalized intersection in Mid-Cambridge. It is ranked #2 in CDOT’s 2025 analysis of higher crash locations and is scheduled for quick-build upgrades in 2026 as part of the Intersection Safety Program.

Project Area Map:

What To Expect 

At this intersection, we will be using the following Safety Treatment Tools: 

 

Time Separated Turns

This project will add dedicated signal time for the northbound left turn from Prospect St to Hampshire St.

 

Corner Islands

The right turn paths from Hampshire St to Prospect St will be lined with flex posts to encourage slower turning speeds.

Head Starts

People walking across the street will get a head start before vehicles begin moving, improving visibility and reducing conflicts with turning traffic.

 

Bicycle Intersection Markings

The approach leg of each bike lane on Hampshire St will be widened to eight feet, and a two-stage turn box will be added.

Click here to learn more about these countermeasures. Click here to see how they'll make their way into the final design.

Time-Separated Turns

  • Both left-turn movements from Prospect St onto Hampshire St have led to multiple serious crashes between drivers and pedestrians, cyclists, and other drivers.
  • This project will add dedicated signal time for the northbound left turn from Prospect St to Hampshire St, meaning that left-turning drivers will not have to look for gaps in traffic to make their turns at this approach.
  • CDOT is prohibiting the southbound left turn movement from Prospect St to Hampshire St as part of this project. The traffic data shows very few drivers make this turn today, but the movement has still contributed to multiple crashes.
  • Time-Separated Turns are not possible on Hampshire St because there is not a separate lane for turning traffic to wait in.

Corner Islands

  • The right turn paths from Hampshire St to Prospect St will be lined with flex posts to encourage slower turning speeds and place drivers at a better angle to see pedestrians and cyclists in the crosswalk.

Head Starts (Leading Intervals)

  • Walk signals along Prospect St will turn on five seconds before any driver has a green light (three seconds is typical).
  • Walk signals and bike green lights along Hampshire St will turn on seven seconds before any driver has a green light.
  • These extended Head Starts let pedestrians and cyclists get into the crosswalk and bike cross before drivers start turning right, making them easier to see.

Bicycle Intersection Markings

  • The approach leg of each bike lane on Hampshire St will be widened to eight feet. This allows more cyclists to queue close to the intersection, improving bicycle traffic flow.
  • A two-stage turn box will be added to allow cyclists on Prospect St to cross Hampshire St going southbound and then turn left onto Hampshire St (this left turn will be prohibited for cars).

Raised Centerlines

  • Both yellow centerlines on Prospect St will be reinforced with low-profile, plastic bumps known as “bumblebees” for their black and yellow striped pattern.
  • Raised Centerlines on Prospect St will slow down left turns from Hampshire St, ensuring that drivers cannot take a shorter path by cutting into the opposing lane. 

Markings, Signage, and Other Maintenance

  • Prospect St will be repaved.
  • Some of the traffic signals at this intersection are smaller than typical and can be difficult to notice. We will replace those signals with standard-sized ones, so they are easier to see in all conditions.
  • There are no accessible pushbuttons at this intersection. We will install them so that those with visual impairments know when it’s safe to cross.

Project Phases

Phase 1
Design Phase

We will collect and analyze intersection specific data on crashes and volumes and select the appropriate countermeasures from our Traffic Safety Countermeasures Toolkit. This phase also includes coordination with other City departments and internal design review. The result is a roll plan showing the changes to how the intersection will look and a signal explainer showing the changes to how the intersection will operate. 

Time Estimate: December 2025 - Fall 2026
Phase 2 (We're here!)
Installation Phase

We will schedule the installation work with our contractors and keep the community informed about any impact on the traveling public. Some work is weather dependent, and all work is dependent on contractor availability.   
 
Time Estimate: 2026 Construction Season
Phase 3
Monitoring Phase

We will conduct follow-up site visits during busy times and review resident feedback to ensure the design is working as expected. To give feedback, please contact the project manager, report an issue using SeeClickFix, or contact the Street Management division.  

Time Estimate: Winter - Spring 2027
Phase 4
Analysis and Future Work

This intersection will be included in future Intersection Safety Program Reports, where we will analyze if serious crashes are trending downward. We will use this analysis to determine if the quick-build project was adequate, or a longer-term project is needed to address a persistent crash trend. Intersection Safety Program reports can be found on the Program homepage.

Stay informed    Subscribe for email updates on Intersection Safety Program work across Cambridge.    Sign up for email updates →

Project Information

Recent Work

The Higher Crash Locations analysis performed by CDOT in 2025 used a crash reporting period spanning 2014-2024. During this time, there were three adjustments to the intersection of Hampshire Street at Prospect Street that affected safety and travel.

  • In 2017, the City of Cambridge striped green cross bike markings on Hampshire Street.
  • In 2021, Inman Square detours sent more traffic along Hampshire Street and a left-turn only lane was temporarily installed on Hampshire St southbound. Parking close to the intersection was also restricted, though this change was permanent.
  • In 2023, the Hampshire Street Safety Improvement Project added separated bike lanes on Hampshire Street.

The graphic below details when various safety improvements were added to the intersection.

Because CDOT’s analysis period covers a few changes to the intersection, we expect that some of the earlier crashes at this location wouldn’t have happened or wouldn’t have been as serious if they had occurred after some of the intersection improvements were in place. However, crash analysis shows that certain crash trends have not been fully addressed yet.

 

Crash Trends

This crash diagram shows all fatal crashes, crashes resulting in serious injury, and crashes involving pedestrians or cyclists from January 2001 to April 2025. The most noticeable trend is the high number of crashes involving a cyclist or pedestrian and a driver turning, especially turns from Prospect St to Hampshire St. With this trend in mind, this project focuses on having drivers turning proceed at a separate time than when pedestrians and cyclists are crossing the street (Time-Separated Turns). Where that is not possible, the project aims to make cyclists and pedestrians more visible while crossing and slowing vehicle turning speeds through Head Starts, Corner Islands, and Raised Centerlines. This project also prohibits a left turn that could not be time-separated.

Click here for a higher resolution.

Contact Us

Leah Grodstein (she/her)
Street Design Project Manager
Department of Transportation
617-349-4609
lgrodstein@cambridgema.gov

Contact Us

How can we help?

Please provide as much detail below as possible so City staff can respond to your inquiry:

As a governmental entity, the Massachusetts Public Records Law applies to records made or received by the City. Any information received through use of this site is subject to the same provisions as information provided on paper.

Read our complete privacy statement


Service Requests

Enter a service request via SeeClickFix for things like missed trash pickups, potholes, etc., click here