Two-Week Look-Ahead: Week of August 10, August 17
Two-Week Look-Ahead: Week of August 10, August 17
Two-Week Look-Ahead: Week of July 27, August 3
Two-Week Look-Ahead: Week of July 13, July 20
Two-Week Look Ahead: Week of June 29, July 6
Two-Week Look Ahead: Week of June 15, June 22
Two-Week Look-Ahead: Week of June 1, June 8
Week of June 1st, June 8th: Sidewalk Work Continues, Paving and Parking Impacts Coming Soon.
What: Curb extension removal at Broadway and Elm St. Sidewalk replacement on Broadway between Inman St and Prospect St.
When: Work will be completed by early June.
Impacts to Parking and Travel: Daytime parking restrictions continue, posted on street with paper signs.
Project Paving to Begin in early June.
Click here to view the project mailing list email.
Two-Week Look-Ahead: Week of May 18, May 25:
Week of May 18th and May 25th: Sidewalk Work Continues, Broadway at Ellery, Broadway at Antrim, Broadway at Elm (curb extension removal) & Broadway - Columbia to Lee St (sidewalk and pedestrian ramp improvements)
What: We installed a new, wider sidewalk near Ellery St. This will provide an accessible path around an existing tree. Curb extension removals at Broadway and Antrim Street have been completed. The curb extension at Broadway and Elm Street is underway.
When: Work will be completed by early June.
Impacts to Parking and Travel: Daytime parking restrictions continue, posted on street with paper signs.
Project Paving to Begin in early June.
Click here to view the project mailing list email.
April 27, 2026: Curb Extension Removals
Broadway at Ellery
Beginning the week of April 27th, City crews will begin work on a sidewalk improvement at Broadway and Ellery Street. This will eliminate 1 parking space on Broadway approaching Ellery Street.
Previous plans showed this parking space removed, but did not include expanding the sidewalk. In order to provide an accessible path of travel and expand room for a mature tree to grow, the City has elected to expand the existing sidewalk into this area.
Broadway at Antrim St and at Elm St
Beginning the week of April 27th, curb extensions at Broadway and Antrim Street and Broadway at Elm Street will take place.
This work is taking place at select locations where existing curb extensions make the street too narrow for bike lanes to be installed. This also includes the removal of 3 bike racks at Antrim Street and the reconstruction of one pedestrian ramp at Elm Street.
Click here to view the project mailing list update.
April 07, 2026: Sidewalk Work to Begin
As part of the City’s sidewalk maintenance contract, crews will make repairs at select locations along Broadway, from Columbia Street to Quincy Street.
Work will take place over approximately six weeks and includes repairs to some sidewalk panels and curb ramps. Areas scheduled for repair will be marked in advance with paint.
Work will begin on Tuesday, April 7 on Broadway near Columbia Street.
What to Expect During Construction:
General work hours will be from 7:00 a.m. – 4 p.m.
On-street parking spaces will be impacted during this work. ‘No Parking’ signs will be posted at least 24 hours before restrictions are in effect.
Please follow pedestrian detour signs.
Access will be maintained for emergency vehicles and City services.
Information & Assistance:
If you have any questions about this work or need assistance, including any special needs or disabilities that require a special accommodation, please contact Yaser Samerraei, Engineer, at 617-388-1334 or ysamerraei@cambridgema.gov
In case of an emergency after hours, please call the 24-Hour line at 617 349-4800.
Click here to view the project mailing list update.
December 12, 2025: Section A Work Complete
Work on Section A is complete. Stay tuned for installation updates on Sections B and C in the Spring 2026.
Two-Week Look Ahead: Week of July 14th and July 21st
Week of July 14th:
- No work scheduled this week.
Week of July 21st (Overnight Hours):
- Flex-post installation may be scheduled this week, depending on weather and contractor's schedule.
- Flex-post installation will require overnight parking restrictions, which will be posted 48 hours in advance.
Future Work:
- Additional overnight work, if required, will require additional overnight parking restrictions.
Click here to view the project mailing list update.
Two-Week Look Ahead: Week of June 30th and July 7th
Week of June 30 (Daytime Hours):
- Continued sign and meter work. Parking regulations will be changing. Keep an eye out for posted signs, both temporary and permanent.
Week of June 30 (Overnight Hours):
- Pavement marking installation will begin. This includes bike lane and other lane lines. This schedule is subject to change due to weather.
- There will be no overnight parking on either side of Broadway beginning June 30th. Paper signs will indicate both permanent and temporary parking restrictions.
- The new stop location will be posted two weeks in advance of the change.
- MBTA will add an alert of the change to its website.
Week of July 7th (Overnight Hours):
- Temporary overnight parking restrictions will continue as needed
- Pavement marking installation will continue, depending on weather.
Future Work:
- Additional overnight work, if required, will require additional overnight parking restrictions.
- Flex-Post installation will be scheduled at a future date, also requiring temporary parking restrictions.
Click here to view the project mailing list update.
Two-Week Look Ahead: Week of June 16th and 23rd
Week of June 16 (Daytime Hours):
- Sign work: Parking signs will be changed to reflect the plans. Click here to view the plans.
- Converting two resident parking spaces to metered parking in front of the businesses near Clark Street.
- Converting two meters to a loading zone at Broadway and Moore Street.
- Converting a loading zone to metered parking across from Davis Street.
- Adding accessible/disability parking near Fletcher-Maynard Academy.
Week of June 23 (Daytime Hours):
- We will move the IB bus stop at Windsor Street to its new location across the street.
- The new stop location will be posted two weeks in advance of the change.
- MBTA will add an alert of the change to its website.
Future Overnight Work:
- Pavement markings will be installed either the week of June 23 or June 30, depending on weather and crew availability.
Click here to view the email update sent to the project mailing list
Click here to view the project mailing list update.
Two-Week Look Ahead: Week of June 2nd and 9th
Week of June 2nd and 9th (Daytime Hours):
- City crews will be on site laying out new signpost locations
Week of June 9th (Overnight Hours):
- Work will take place Wednesday and Thursday night beginning at approximately 8pm each night. This work will not require parking restrictions. Temporary overnight detours may take place.
- This work does not include striping of the bike lane. This work will occur in the coming weeks
Click here to view the email update sent to the project mailing list